Back to Projects
Commercial Door Replacement — Chicago, IL
UpcomingInterior renovation of a hotel guestroom on the 32nd floor including selective demolition and replacement of the bathroom door to enlarge the opening, along with finishes, fixtures, and lighting upgrades.
Project Details
ScopeDoor Replacement, Renovation
LocationChicago, IL
Project TypeCommercial
Buyer TypeGc
Estimated Value$67,543
Timeline
PostedOctober 23, 2026
Submission DeadlineNot specified
TimelineNot specified
Description
SELF CERT 2019 CBRC: INTERIOR RENOVATION OF MODEL GUESTROOM ON FLOOR 32 ROOM 3211. THIS IS A STANDARD KING GUESTROOM. SCOPE INCLUDES SELECTIVE DEMOLITION OF THE BATHROOM DOOR (TO ENLARGE DOOR OPENING), REMOVAL AND REPLACEMENT OF FINISHES, FURNITURE, BATHING AND VANITY PLUMBING FIXTURES, LIGHTING FIXTURES AND CONTROLS. OCCUPANT LOAD UNDER 300.(OCCUPANCY R-1, TYPE IA CONSTRUCTION)
Lead Details
Interested in this project?
Create a contractor account to submit a bid and connect with the project owner.
Register as ContractorSign InHave a project to post? Submit it here
